Engineering work to affect South Western Railway’s Easter services

Picture of Janine Booth

Share:

Engineering work to affect South Western Railway’s Easter services

Share:

Picture of Janine Booth

Share:

South Western Railway train
South Western Railway train // Credit: Stuart Bailey

Network Rail is carrying out major engineering working over Easter, which will affect services to and from London Waterloo. South Western Railway (SWR) is urging passengers to plan ahead.

The big majority of the SWR network will be open, but rail replacement buses will operate in some areas.

Some train services will be revised or diverted, will start and/or terminate at different stations, or will not run.

SWR is advising passengers to check their entire journey before travelling using a journey planner, as engineering work may also affect other train operators and parts of the wider network.

Full information on engineering work affecting the SWR network can be found on the company’s Planned Improvements page.

to Winchester and Andover

  • From Good Friday, 7 April, until Easter Monday, 10 April, the lines from Woking to Winchester and Andover (including ) will be closed. Buses will replace trains between these stations.
  • The line between Basingstoke and Reading will also be closed and buses will replace trains between Reading and Andover.
  • Other train services between London Waterloo and Weymouth, Portsmouth, Alton, Salisbury and Exeter St Davids will be altered for all four days. Customers should check before travelling and allow extra time to complete their journeys.

Staines area

  • Lines in the Staines area will be closed on Saturday 8 and Sunday 9 April. Buses will replace trains between Hounslow, and Windsor & Eton Riverside, both via Staines.
  • Train services towards Reading, /Woking via Staines, Windsor and Eton Riverside, and Hounslow via Richmond and Brentford, will all be affected, so customers should check their journeys carefully.

Vauxhall, Queenstown Road (Battersea) and

  • On Sunday 9 and Monday 10 April, some lines in the Queenstown Road (Battersea) area will be closed. Earlsfield station will be closed on both days and fewer trains will serve Vauxhall.
  • Customers are asked to use other nearby stations, however buses will also run between Clapham Junction, Earlsfield and Wimbledon.
  • On Sunday, services between London Waterloo, Chessington South and Hampton Court will run hourly.
  • On Monday, services between London Waterloo, Chessington South, Shepperton, Hampton Court and Guildford via Cobham will run hourly.
  • On both days, these amended services will not call at Earlsfield or Vauxhall. Other service alterations will be in effect and customers should check before travelling.

Peter Williams, Customer and Commercial Director at South Western Railway, said: “Closing the railway when many people are planning leisure trips is of course frustrating, but the Easter bank holidays are typically a quieter time on our network and we need to make sure engineering works impact as few customers as possible.

“Where works are taking place, rail replacement buses will be running to keep people moving and the vast majority of our network will be unaffected. I’d like to thank customers for their patience and understanding whilst these essential works are carried out.”

Mark Killick, Network Rail’s Wessex Route Director, said: “I’d like to thank customers for their patience while we carry out these important improvement works over the Easter period. I recognise there is never a good time to close the railway, so we are completing these works while customer numbers are lower at Easter which minimises the number of customers who will be affected.

“The majority of the network will be open as usual for people to take a short break or visit loved ones, but some services may be affected so I’d ask our customers to please plan ahead and check journeys in advance.”

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles