Railway reopens in Manchester after burst water main repaired

Roger Smith - Contributor Add a Comment 3 Min Read
Cleared track after flood water subsided from burst water main in Audenshaw // Credit: Network Rail

In the early hours of Thursday, 2nd September, a water main burst at Audenshaw in east that caused severe to trains.

After a pipe operated by the water company United Utilities ruptured, thousands of gallons of water flooded the railway line between and stations, affecting over three miles of track. Since then, teams have worked around the clock to repair the flood damage, with the result that this afternoon, Monday, 6th September, the railway has reopened to passengers.

Flooding on the railway near Audenshaw reservoir
Flooding on the railway near Audenshaw reservoir // Credit: Network Rail

During the closure, engineers fixed mortar that had been washed away inside Bessemer Street railway bridge and in some areas of track where sinkholes had appeared. Electric equipment that had become submerged also required repairs.

Railway equipment in flowing floodwater after burst water main // Credit: Network Rail

As there may be knock-on effects while services return to the normal timetable, intending passengers should check with Enquiries at www.nationalrail.co.uk before they travel for the latest travel information. Further updates can be obtained from the @NetworkRailMAN and @NationalRailEnq Twitter feeds.

Network Rail engineers surveying flood waters after water main burst // Credit: Network Rail

Paul Owen, Network Rail's North West route operations manager, said: “I'd like to thank passengers for their patience while we worked tirelessly to get the railway back up and running after it was damaged by the burst water main at Audenshaw. We'll continue to support United Utilities as they work to repair their pipe beside our tracks over the coming days.

“With over three miles of track submerged by fast flowing water it was essential we inspected everything thoroughly and made the necessary repairs before we could reopen the line so trains could run safely again. Thankfully that's now complete but I'd remind people to check National Rail Enquiries as there may still be knock-on delays today while trains return to the usual timetable.”

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X