10-day blockade complete to keep North Yorkshire freight trains running

Cameron White - Contributor Add a Comment 3 Min Read
Credit: Network Rail

has completed work in North Yorkshire to keep freight trains running to the .

A 10-day blockade was put in place whilst the work was undertaken to install a new waterproofing system, strengthen steelwork and replace 100m of track.

The £2.1m repair and strengthen project has been completed on Aire Bridge and will bring better reliability for the 100 freight services each week which provide materials both to and from Drax Power Station.

The blockade took place from the 27th of August to the 6th of September with a Network Rail team removing more than 100m of track to allow new waterpoofing, drainage system and a concrete slab to be installed.

Credit: Network Rail

New rails along with sleepers and ballast also had to be re-laid. At the same time work was also undertaken to strengthen the steel structure, which will create less need for maintenance work moving into the future.

The maintenance work means that rainwater now drains more efficiently and is less likely to create structural damage, which will allow the freight trains to move biomass to and from Drax Power Station much more reliably.

Credit: Network Rail

The bridge is a three-span underbridge crossing the River Aire, and is 65m in length, carrying the twin ballasted, non-electrified tracks to the power station which currently provides around 12% of the UK's renewable electricity.

Matt Rice, Route Director for Network Rail's North & East Route, said: “I'd like to say a huge thank you to local residents and our colleagues at Drax Power Station for their patience and collaboration while we completed these essential repairs.

“By strengthening the bridge, we're able to reduce the number of delays caused by future maintenance work and therefore deliver an improved service for our freight customers and the communities they serve.”

Credit: Network Rail

Mark Gibbens, Drax Group's Head of Logistics, said: “Drax Power Station is the UK's biggest renewable power generator, providing enough green energy for 4 million homes in the first half of this year.

“Network Rail's work to strengthen the bridge makes our global sustainable biomass supply chain more resilient, ensuring millions of homes and businesses can rely on the renewable power Drax generates.”

Where Next?

RAILADVENT NEWS
The latest railway news
RailAdvent Plus
Railway Discounts, 4k Video, pictures and more!
FREE NEWSLETTERS
Signup to our daily and weekly newsletters
RAILADVENT SHOP
Railway Prints, DVD's / Blu-Ray's, books and more
LOCOSTOP COMMUNITY
Come and share your railway pictures
UK STEAM INFO
Upcoming mainline steam tours/loco movements
NETWORK RAIL
Visit their website

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X