Weybridge engineering work means trains can travel at 90mph once again

Victoria Thompson - Editor 1 comment 2 Min Read
Credit: Network Rail

Upgrade work carried out by on the line near means that speed restrictions in the area have been removed.

Services between London, Surrey, Hampshire and Dorset were affected by the speed restrictions which were in place.

Engineers from Network Rail worked between the 8th and 10th of August around the clock, replacing track, conductor rails and a set of points at Weybridge in Surrey.

Trains can now once again travel at 90mph on the fast lines, meaning few delays to services to and from .

Weybridge track renewals
Credit: Network Rail

Mark Killick, Network Rail Wessex route director, said: “We really appreciate customers' patience as we know this added considerably to journey times for them over the weekend and on Monday.

“We didn't take the decision to do the work on Monday lightly, but the alternative would have been even more disruptive and involved closing the railway for several more weekends. This upgrade will allow us to deliver a faster and more reliable train service for decades to come.”

Alan Penlington, SWR's customer experience director, said: “The work Network Rail completed during this three day closure means that trains can travel through this section of our network more quickly and our customers will benefit from a more punctual and reliable service.

“Closing the railway on a weekday inevitably causes disruption and I'd like to thank our customers for their patience whilst these essential works were carried out.”

Where Next?

RAILADVENT NEWS
The latest railway news
RailAdvent Plus
Railway Discounts, 4k Video, pictures and more!
FREE NEWSLETTERS
Signup to our daily and weekly newsletters
RAILADVENT SHOP
Railway Prints, DVD's / Blu-Ray's, books and more
LOCOSTOP COMMUNITY
Come and share your railway pictures
UK STEAM INFO
Upcoming mainline steam tours/loco movements
NETWORK RAIL
Visit their website

Share This Article
1 Comment
  • And in time for the introduction of South Western Railway “Arterio” Class 701s which is schedule for service before the end of this year.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X