Duke steam locomotive receives boiler at the Ecclesbourne Valley Railway

Michael Holden - Editor Add a Comment 2 Min Read
Credit: The Duke's Owner, Tim

1944-built steam loco Austerity ‘The Duke' has had its boiler fitted after a number of years undergoing work.

The work was carried out by a specialist repairer 50 miles from Wirksworth.

The locomotive now looks more like a steam locomotive once again.

On the day of the lift, The Duke was sat in the car park as owner, Tim, arrived, and found the locomotive was shunted the previous day with volunteers making sure everything was properly oiled.

The Duke at Wirksworth
Credit: The Duke's Owner, Tim

The boiler insulation was delivered in the morning, but there was a delay to the boiler arrival due to an issue with the ashpan, which the team had decided to fit at their works rather than on-site.

Around 5 pm on the day of the lift, the boiler arrived. It took around 2 hours to lift into place.

Credit: The Duke's Owner, Tim

The smokebox isn't yet attached to the barrel and is held in place by a ratchet strap but this should be attached in the near future.

Where Next?

RAILADVENT NEWS
The latest railway news
RailAdvent Plus
Discounts, videos, pictures and more!
FREE NEWSLETTERS
Signup to our daily and weekly newsletters
RAILADVENT SHOP
Railway Prints, DVD's / Blu-Ray's, books and more
LOCOSTOP COMMUNITY
Come and share your railway pictures
UK STEAM INFO
Upcoming mainline steam tours/loco movements
Ecclesbourne Valley Railway
Visit their website

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X