Clacton-on-Sea area to see 23-days of railway engineering work and some rail replacement buses

Alan Holden 2 comments 4 Min Read
Credit: Network Rail

As announced last year, are now reminding rail passengers about the upcoming 23 days of engineering work in the area,

New computer-based signalling will go live as part of the works, enabling the signals and points to be controlled from Colchester.

The work is taking place between Saturday 20th February and Sunday 14th March, it will include changes to the overhead line equipment and changes to the track layout along with the signals and points.

Rail replacement buses (RRB) will be in operation at times during the works with the following changes expected.

RRB between Clacton-on-Sea/ and on Saturday 20 and 27 February and 6 and 13 March

RRB between Clacton-on-Sea/Walton-on-the-Naze and Colchester on Sunday 21 and 28 February and 7 and 14 March

During the week Monday to Friday, buses will replace trains between Clacton and Frinton, with trains running between Walton-on-the-Naze and London.

Clacton signal box train approaching
Credit: Network Rail

Passengers making essential journeys should plan ahead now using either National Rail enquiries or the Greater Anglia website.

Ellie Burrows, Network Rail's route director for Anglia, said: “Keeping the tracks in good condition is vital to running a safe and reliable railway for our passengers and that is exactly what we're here to do.”

“I'm sorry for the disruption that 23 days of engineering works will cause for passengers. Completing these large-scale projects and maintenance in one coordinated effort, will help reduce the overall amount of disruption for many years to come.”

Jamie Burles, Greater Anglia managing director, said: “This work is essential for improving the reliability of the Clacton and Walton-on-the-Naze lines. In combination with our brand-new trains, which we will be introducing into passenger service on the route later this year, we and Network Rail are completely modernising rail services in this area.”

“Throughout the works, we will make sure people can complete their journeys, although part of it may be by rail replacement bus. We'd remind people to check before they travel and allow extra time. Updates on the project can be found on social media using #Clacton2021.”

“Current Government advice is to stay at home and only to travel for legally permissible reasons such as for work or medical appointments. Greater Anglia is committed to keeping travellers safe with increased cleaning and sanitisation and measures to make it easier to socially distance. Passengers are reminded it's compulsory to wear a face covering on our trains, stations and rail replacement buses.”

Where Next?

RAILADVENT PLUS
Support the website and get member benefits in return
RAILADVENT NEWS
The latest railway news
RAILADVENT SHOP
Railway Prints, DVD's / Blu-Ray's, books and more
LOCOSTOP COMMUNITY
Come and share your railway pictures
UK STEAM INFO
Upcoming mainline steam tours/loco movements
NETWORK RAIL
Visit their website

Share This Article
2 Comments
  • We have had engineering works on this line non stop for 15yrs over weekends now we have to suffer again.as a builder it stops me working weekends as can’t justify being late every time the bus replacement is a shambles very rarely do you make the connection and as always not a member of staff to be seen all this for £175.60 a week.spencer whale

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X