An Update on the overhaul of GWR steam locomotive 4110

Jamie Duggan - Contributor Add a Comment 2 Min Read
Optical Telescope Mounted in the front of the Left-Hand Cylinder // Credit Steve Masters

The has posted their latest update on the overhaul of Great Western Railway steam locomotive 5101 Class No 4110 at their Cranmore Locomotive Works.

Mirror setup ready for Checking Dimensions // Credit Steve Masters
Mirror setup ready for Checking Dimensions // Credit Steve Masters

‘Bottom-end' Alignment

Recent work has been focused on the striped frame of the engine. Optical Alignment Gear has been set up to ensure the horn faces are the correct dimensions.

Accurate set up of the components forming the rolling chassis is key to reduce down-time during the engine's 10-year ticket and increasing the life of each component.

The Great Western Railway became the first British railway to use this equipment, which increased miles between repairs or maintenance was required.

Grinding First Pair of Horn Guides // Credit Steve Masters

Once checked and any corrections made to ensure the horn guides are true, they will be ready for when work begins on overhauling the coupled wheel's axleboxes.

The photos show the equipment used assessing the horn guides.

For more information on the overhaul of steam locomotive 4110, or to support the East Somerset Railway, please visit their website here.

Where Next?

RailAdvent Plus
   Get image downloads, Prints and Streaming Video
News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Railway Prints, DVD's / Blu-Ray's and more
LocoStop – The RailAdvent Community
   Come and share your railway pictures
Mainline UK Steam Info
   Upcoming mainline steam tours/loco movements

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X