Rail upgrades completed despite pandemic over Easter weekend

Victoria Thompson - Editor 1 comment 2 Min Read
Credit: Network rail

Network Rail has announced that it has completed a variety of upgrades to the West Coast Main Line over the Easter weekend.

From Friday 10 April until Monday 13 April, teams completed the work to improve the railway for passenger and freight trains.

 

Euxton junction renewal
Euxton Junction Renewal // Credit:

The essential upgrades include the replacement of a major railway junction linking the West Coast mainline to the Manchester to Preston line at Euxton, near Chorley.

 

Track renewal work at took place; along with preparing to remove a railway flyover at Bletchley.

Meanwhile, at in Liverpool, the passenger footbridge was replaced to ensure it remains safe for years to come.

Mossley Hill Footbridge Renewal // Credit: Network Rail

Passengers are warned not to travel unless absolutely necessary because of the current pandemic.

What did the officials say?

Tim Shoveller, managing director for Network Rail's North West & Central region, said:

“The schemes we have undertaken this Easter weekend were all critical pieces work. We were able to plan it so as to minimise disruption to freight and essential journeys. This work will help to ensure the railway is at its best when Britain emerges from this coronavirus pandemic.

“I'm very proud of our mission-critical frontline colleagues, including railway upgrade engineers, signallers, maintenance, control room and operations staff, who are Britain's hidden heroes keeping Britain connected in this time of need.”

Where Next?

RailAdvent Plus
   Get image downloads, Prints and Streaming Video
News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD's / Blu-Ray's and more
LocoStop Community
   Come and share your railway pictures
Mainline Steam Info
   Upcoming mainline steam tours/loco movements
Network Rail
   Visit their website

Share This Article
1 Comment
  • So is the East-West Rail link actually going to happen since the flyover at Bletchley has been removed. Or is the East-West Rail link has been postponed.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X