March 2020 update on steam locomotive 32424 “Beachy Head”

Jamie Duggan - Contributor Add a Comment 2 Min Read
Tender // Credit Bluebell Railway Atlantic Group

The Bluebell Railway Atlantic Group have posted their latest update, containing progress on building new build London, Brighton and South Coast Railway H2 Class No.32424 “Beachy Head” at the .

Boiler

Over the winter the team have been busy cutting and forming the lagging and cladding for the boiler.

This work has taken longer than expected, but the majority of the firebox is completed, with the curved panels the last to be fitted.

The sheets for the boiler barrel have been ordered, but unlikely to arrive soon due to COVID-19.

Manhole in Tender Tank // Credit Bluebell Railway Atlantic Group
Manhole in Tender Tank // Credit Bluebell Railway Atlantic Group

Tender

Great progress has been made on the tender, with recent work seeing the injector water feed stainless steel strainers fixed in place. A new addition to the tender tank is the fitting of a manhole, to allow easier access for maintenance and repair.

Two cupboards have been fitted to house shut off valves and gauges for both the air and vacuum systems.

On top of the tank, the flared top and coal rail are being trial fitted, with the beading also being fixed on. The safety links are ready for fitting.

For more information or to support the Bluebell Railway Atlantic Group, please visit their website here.

Where Next?

RailAdvent Watch & Donate
   Now available on selected products
News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD's / Blu-Ray's and more
LocoStop Community
   Come and share your railway pictures
Mainline Steam Info
   Upcoming mainline steam tours/loco movements

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X