An update on RHDR No 11 ‘Black Prince’

Callum Calvert Add a Comment 1 Min Read
Credit: Paul Trotter

An update has been released on the overhaul work taking place on No. 11  Black Prince.

No. 11 has moved from Ravenglass workshops to Old Farm Engineering.

The boiler has been stripped and the tubes removed. The boiler inspector did his initial examination and was happy with the condition of the boiler.

The next stage for the boiler overhaul is NDT (Non-Destructive Testing) which is a way of detecting cracks which are not visible to the eye.

Stripping of the chassis is also progressing well, with no major surprises but it is confirmed that No11 is tired and worn out after her latest stint of running on the .

For more information on ‘Black Prince' and the RHDR click here.

Where Next?

News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD's / Blu-Ray's and more
LocoStop Community
   Come and share your railway pictures
Mainline Steam Info
   Upcoming mainline steam tours/loco movements

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X