c2c thanks customers for patience during recent works

Alan Holden 1 comment 1 Min Read
c2c // Credit: Railway News

has said a huge thank you to all their passengers for their patience during recent works.

This follows a period of 16 days where they had to operate an amended timetable on the route during construction works

From today (5th August) all c2c trains are now running back on their usual timetable which can be found on their website here.

The amended timetable had been in operation due to Tfl carrying out works in the Barking Riverside area, with some services having additional journey times in the morning and evening, or in some cases being replaced by buses.

Where Next?

News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD's / Blu-Ray's and more
LocoStop Community
   Come and share your railway pictures

TAGGED:
Share This Article
1 Comment
  • Perhaps Network Rail should start work on replacing the ageing overhead wires from Factory Gas Junction near Bromley-by-Bow to London Fenchurch Street. As the overhead wires were first installed in the 1950s as Network Rail are still continuing on replacing overhead wires on the Southend Victoria line.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X