An update on diesel and steam locomotives at the Lappa Valley

Michael Holden - Editor Add a Comment 4 Min Read
Credit: Lappa Valley Railway

The Lappa Valley Railway has released an update on their diesel and steam locomotives.

Each year, steam locomotives need to have a boiler exam, in which the are in the process of preparing the fleet.

During the winter, the railway has also undertaken some track replacement, which has seen 45 panels of track relaid.

Here are the stats collected for the steam locomotives  in 2018:

RUBY:             70 steamings             1400 miles

ELLIE:            157 steamings            3140 miles

ZEBEDEE:       91 steamings              1820 miles

MUFFIN:         9 steamings                180 miles

Muffin

Muffin returned to service after a boiler overhaul last year and has had a few days to run her in since. Unfortunately, during the steam extravaganza, a look crank weight was found on the driving axle.

It was decided that the issue would be addressed in the Spring, with work beginning in February to repair the crank weight. Once the problem was identified, the crank weight was removed and the team then reassembled the locomotive. So far, the locomotive is all well and good.

Zebedee

Zebedee was a good locomotive in 2018 and there is nothing much else to report on in this update. It is expected that the locomotive will undergo a bottom end overhaul at the end of this season. was a strong performer for 2018 and there is very little to report on the locomotive since my last update. Whilst Zebedee is in the 2019 loco pool, she will primarily be spare locomotive to cover the odd gap here and there.

Ellie

Ellie performed well for the back end of 2018. The locomotive has then been drained and laid up for the winter. Other than a repaint of the back head of the boiler, Ellie has had little work done over the winter.

Ruby

Ruby has been busy hauling trains over the winter, following her return to steam following a massive effort to replace boiler tubes. At the time of writing, Ruby is busy working the passenger trains for the winter weekends.

Arthur

Arthur has performed well throughout the winter maintenance season, hauling works trains up and down the line.

City of Derby

A regular performer of the winter season, City of Derby has now been withdrawn from service for an overhaul. Work will include brand new bogies, a complete rewire, extensive structural strengthening and improvements as well as extensive bodywork repairs and a full repaint. The railway expects to see City of Derby return to service mid May – early June.

Where Next?

News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD's / Blu-Ray's and more
LocoStop Community
   Come and share your railway pictures
Lappa Valley Railway
   Visit their website

TAGGED:
Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X