February 2019 update on steam locomotive 82045

Michael Holden - Editor Add a Comment 1 Min Read
Credit: Peter Line

The 82045 Locomotive Trust has released a short update on the work being completed on new build steam locomotive 82045.

82045’s pony truck axleboxes have gone to Osborne Engineering Ltd. in Cramlington for white metalling and partial assembly of the frame for the rear pony truck has started.

The valve chest cover bushes are also one of the components that require white metal lining in the bore.

The pressure relief valves for the cylinder end covers are currently being manufactured by Philip Oldfield Engineering.

Brake rigging components are still being manufactured, with progress on these heading in the right direction.

Where Next?

News Homepage
   For the Latest Railway News
RailAdvent Online Shop
   Framed Prints, DVD’s / Blu-Ray’s and more
LocoStop Community
   Come and share your railway pictures
82045 trust
   Visit their website

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X