Throwback Thursdays – Ep. 51 – Earl Of Merioneth at Tanybwlch

Michael Holden - Editor Add a Comment 1 Min Read

As we approach the first anniversary of our ‘Throwback Thursday' series, we see ‘Earl Of Merioneth' at Tanybwlch during a special event in 2013.

Earl Of Merioneth at the

‘Earl Of Merioneth' is a 0-4-4-0 Double Farlie and was the 3rd locomotive built at Boston Lodge Works. The loco was complete in 1979, and was a replacement for No. 3 Livingston Thomspon (now at the National Railway Museum in York) – the superheated boiler was made by the Hunslet Engine Co at Leeds.

Double Fairlie Earl Of Merioneth has now been taken out of service, and will be replaced by new build ‘James Spooner' when the loco is built hopefully by 2018.

 

[vc_row][vc_column][td_block_14 custom_title=”More Ffestiniog Railway” post_ids=”-2058″ category_id=”12″ limit=”3″][/vc_column][/vc_row]

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Exit mobile version
X