Busy Bee
After spending the summer away at Great Bush Railway, Emmet returned to the Old Kiln on Thursday morning on the back of a HIAB. It didn’t take the two chaps from the hauliers long to crane her onto our rails, and we gave them a cuppa and a tour of the loco sheds before they left. We stabled Emmet near the front of number 5 road so I’d be able to easily pull her out into the yard on Saturday.
One of our volunteers arrived to do some maintenance work, replacing some rotten timber on the roof of our Hayling coach no. 4 before it deteriorated to the point where it might let water get inside. He mentioned that one of the backrests for the bench seats inside had come loose so I repaired that, cleaning up the wood surfaces and cutting off old screws before gluing the rail back in place and fixing it with new screws. I don’t get many opportunities to do a bit of woodwork, so this was a pleasant change from what I spend most of my time doing.
It was an early start on Saturday, beginning with cleaning Elouise after she’d been in operation last weekend. Smokebox first, where I swept the tubes and cleaned out the soot and ash, then round to the cab to rake the cinders and clinker to the back of the grate under the fire-hole where I could scoop them up into a bucket. Finally I climbed down so I could clean out the ashpan.
I took the opportunity to give her a cold boiler examination, checking her washout plugs, mudhole door, fusible plug, stays and tubes for any moisture that might indicate a leak. I used a light shining along the inside plates of the firebox to check for quilting, then lastly I tested both water gauges, making sure they filled and drained properly to show that the ways were clear.
We had one last job before I could put her away: the left hand injector needed a new gasket between the flanges where the steam delivery pipe connects at the top. I measured the width between opposite bolt holes to give me the outside diameter for the gasket and verified that the internal diameter of the pipe was ¾”, then cut a ring of gasket material, applied a thin layer of sealant on each side, and fitted it before tightening up the bolts.
After putting Elouise away and pulling Emmet out of the shed, I took a break for lunch before removing Emmet’s 11 washout plugs; there was no need to clean her or drain the boiler as that had been done before she was delivered back to us. I washed out the boiler, teasing the last few bits of rust and scale with a finger in the plug holes. Once I was happy that the boiler was clean and the water draining from the plugholes was running clear I put cloth wicks in the lowest plugholes to siphon the last water from around the foundation ring and we shunted her back into the shed.
On Sunday I was once again at the railway, this time to join a colleague in replacing sleepers along a section of line where we’d had a TSR (Temporary Speed Restriction) in place all summer due to a twist in the track. I arrived first so I prepped the diesel loco, Hunslet 37, and coupled up the P-way flatbed wagon, parking alongside the P-way shed in the yard so I could start loading tools onto the wagon: a couple of rail jacks, spades and shovels, hammer, spike maul, pry bars, spirit level, gauge bars, oil, drill. After my colleague arrived we added four new softwood sleepers and I drove the train down to where we’d be working.
We first levered the spikes out of the sleepers to be replaced, then dug out the ballast around them and jacked up the rails before pulling each sleeper out to one side. We had initially intended to replace just a couple of rotten sleepers but it soon became apparent that the next three were also in poor condition so in the end we removed five. A couple of them came apart as we pulled them out, showing just how rotten they had become underneath the top inch or so that had been visible above the ballast.
For each of the replacements we first cleared a channel under the rails so we could slide it into place, leaving space underneath to pack ballast. With it squared up in the correct position we checked for cant using the spirit level, then used gauge bars to make sure the rail spacing was correct. Then we drilled holes for the spikes, filled them with oil and then hammered home the four spikes: one each side of each rail to secure the rail foot to the sleeper. The two of us replaced all five in about half a day: a job well done, and after getting another colleague to check the work and sign off on it we removed the TSR and finished up, heading back to the mess room to put our feet up with a welcome cuppa.
Another productive and varied weekend. We’ve got some running days coming up later this month around half-term but otherwise we’re moving into the off season when we do most of our planned maintenance: less running, more fixing.