A project to renew critical cross-track drainage infrastructure at Gobowen in Shropshire has been completed by the South Rail Systems Alliance (SRSA).
The major part of the work was to replace a siphon, which allows a nearby river to flow underneath the railway and helps to protect both the railway and the surrounding area from flooding.

Before work began, a temporary water management system was installed, which allowed the river to be safely diverted away from the worksite to maintain the natural flow of the river while construction took place.
The temporary arrangements included a dam, over-pumping arrangements, and contingency pumping equipment.
To provide access to the existing siphon so that new drainage infrastructure could be installed, sections of track were removed, and the area around the existing structure was excavated to a depth of approximately two metres below track level; deeper excavations were needed on either side of the railway embankment.
The South Rail Systems Alliance worked with Network Rail, Shropshire Council, local landowners, the Lead Local Flood Authority, and Natural Resources Wales to obtain the relevant permits, approvals, and environmental consents.
Construction of the new siphon included the installation of a new prefabricated set of headwall components, which incorporated three 900 mm diameter siphon bores.
Once they had been installed, the track was relaid, stressed, and tamped.

Also part of the project was the installation of a solar- and hydro-powered, fully automated and self-managing electric trash screen, which will automatically move debris onto a conveyor belt, thereby preventing debris from entering the siphon; the conveyor belt will then discharge the debris straight into the cess. This new system significantly reduces the ongoing maintenance burden associated with the asset and significantly reduces pollution for the local wildlife and waterways.
The South Rail Systems Alliance is a partnership between Colas Rail UK as the constructor, Aecom as the designer, and Network Rail, which provides an integrated delivery service for track civil engineering. Colas Rail UK’s Infrastructure division was recently awarded a contract to install the Signalling & Telecommunications and Power infrastructure on the railway line being reopened to Prtishead in North Somerset.
“Ultimately, the completed infrastructure upgrades provide a much more resilient solution and should significantly reduce the risk of flooding that has previously occurred. The new system removes a lot of the difficulties associated with maintaining and clearing the existing asset. I’m thankful for our team, supply chain and organisations we worked alongside on a really significant project for the local community, with a substantial amount of complex civil engineering, railway and environmental work delivered within the project.”
Joe Smale, SRSA Production Manager