Update on work carried out on steam locomotive 6695’s boiler

Picture of Jamie Duggan

Share:

Update on work carried out on steam locomotive 6695’s boiler

Share:

Picture of Jamie Duggan

Share:

6695's Boiler outside the Flour Mill Workshop // Credit Bill Parker
6695's Boiler outside the Flour Mill Workshop // Credit Bill Parker

The 6695 Locomotive Group have released information on the latest work carried out on 6695’s boiler at the Flour Mill Workshops.

Work completed to date

All rivets for the foundation ring have now been removed. The steel plate which was wasted groove plate has been cut away from the bottom of the outer side sheets.

Next work to be carried out?

To carry out the next work, removal of the foundation ring and the lower section of the throat plate will also be removed. The boiler will need to be turned upside down.

Yesterday, we published details of the Crowdfunding Page set up by the 6695 Locomotive Group to help raise funds to overhaul the Boiler at the Flour Mill Workshop.

More information about this can be found here

Responses

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Related Articles