73082
73082 "Camelot" undergoing maintenance // Credit The 73082 Camelot Locomotive Society

BR Standard 5 No. 73082 “Camelot” has been undergoing maintenance work at the Bluebell Railway. The work is being carried out by the Bluebell Railway’s Workshop team.

What work has been done?
Removed Pistons from 73082 // Credit The 73082 Camelot Locomotive Society
Removed Pistons from 73082 // Credit The 73082 Camelot Locomotive Society

Removal of the valves and pistons and examination of the bores on 73082 has shown that they have been kept very clean. This has come down to the Lubricator doing a perfect job.

The bores will not require any re-boring, having a good diameter size. Both the valves and pistons will require work, with the new piston heads and rings for the pistons and new rings for the valves.

The white metal bearing surface of the crossheads will need to be built-up. Both the crosshead’s location points and associated slidebars don’t need an attention.

Re-metalling of some brushes belonging to the coupling and connecting rods will take place, with the motion rods having a clean.

Jamie Duggan avatar
Since I was a child, I have been a big fan of steam locomotives. This enthusiasm has been become greater in recent years, leading to me becoming involved in a society restoring a standard gauge locomotive. Joining the RailAdvent team in 2017, I help Michael produce articles.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.